Illumination Levels in Construction site

Examples of recommended minimum target values for building activities as mentioned Below

External lighting:

  • Circulation: 10 lx
  • Materials handling: 10 lx

Internal lighting:

Saturday, 16 January 2021

Transformer Short circuit calculation at Secondary terminals

  • In a simplified approach, the impedance of the MV system is assumed to be negligibly small, so that:

where

and:

S = kVA rating of the transformer
U20 = phase-to-phase secondary no-load voltage
In = rated current of the transformer
Isc = short-circuit current in amps
Usc = short-circuit impedance voltage of the transformer in %.