Illumination Levels in Construction site
Examples of recommended minimum target values for building activities as mentioned Below
External lighting:
- Circulation: 10 lx
- Materials handling: 10 lx
Internal lighting:
- Circulation: 5 lx
- Working areas: 15 lx
- Concreting: 50 lx
- Carpentry and joinery: 100 lx
- Bricklaying and plastering: 100 lx
- Painting and decorating: 200 lx
- Site offices: 200 lx
- Drawing board positions: 300 lx
Saturday, 6 February 2021
Saturday, 16 January 2021
Transformer Short circuit calculation at Secondary terminals
- In a simplified approach, the impedance of the MV system is assumed to be negligibly small, so that:
where
and:
S = kVA rating of the transformer
U20 = phase-to-phase secondary no-load voltage
In = rated current of the transformer
Isc = short-circuit current in amps
Usc = short-circuit impedance voltage of the transformer in %.
Sunday, 20 December 2020
Subscribe to:
Posts (Atom)
THEYAVAR KULAI NADUNGA (தீயவர் குலை நடுங்க)
A movie with good concept of taking revenge for abuse of little girl with speech and control of body deficiency 1. People shoul...
-
IR Value for Electrical cable and wiring: For insulation testing, we need to disconnect from panel or equipment and keep them isolated fr...
-
UPS Terminology A/C Alternating Current A/D Analog to Digital Alternating Current ...
-